Tag Archives: Solidedge

Solid Edge ST9 On The GTAC Site For Customer Downloads

I used to get real excited about this time of year and with great anticipation looked for the latest and greatest from Solid Edge. This is the first year since ST1 that I am not a customer of this great design program so I will have very little to say about its capabilities as an actual user. I have also lost most interest as a blogger in this product so I won’t comment on much else about it insofar as new features above and beyond what I have already said. Namely that genuine game changing innovations appear to be giving way to cutesy marketing gimmick stuff some of which from what I gather in reading on the Siemens forums is only partly done. The pace of transformative innovation regarding pure cad design improvements have slowed down with SE in my opinion but it is the best mid range MCAD program out there as far as I am concerned. To bad it is owned by people who hold it in contempt

In any case if you are a current customer check in to GTAC and get your latest and greatest. If you wish to try SE, and if you never have I recommend you do so, they have a 45 day trial period. We all know how quickly 30 days goes by so 45 is much better.  Solid Edge has not gone subscription only stupid so this is a HUGE plus for them. I intend to use SE ST8 for as long as I can. I try to learn Inventor on occasion but it is so clunky and un-intuitive to me compared to SE that these brief sojourns into masochism quickly end. I see the great work done with Inventor so I know it is capable. The mindset behind how it works is alien to me compared to SE though which just clicked for me right away. I don’t have to learn it and at this time don’t intend to either.

To bad the only  integrated CAM program for SE is such a PITA to use and of course Cam Express which clueless sales droids will sell to you in a heart beat is not integrated at all. Such is life here sadly. Going by the CAMWorks for SE site this week and there has been one post in the last sixteen months. SE users are not amused nor enticed to be there.

Is this a new trend with software companies? To release something to say there is fabulous new stuff you just have to have even though it is not finished and has serious usability problems? Looks like Autodesk Inventor Pro HSM is doing that and Siemens from what I read is too with SE. Just a tip here to software authoring companies. Something actual manufacturing concerns learn very quickly which is sales people will get you in trouble every time with promises just to close a deal and then YOU have to make it work. Or not.

I think with SE and Inventor Pro HSM the sales guys have run ahead of reality and just to let you sales brainiacs  know customers are not amused when their yearly fees produce new features that do not work right or at all. Carts do not pull horses although the cart driver can choose to get on a steep hill and run over the horses. Sales and Marketing or is it  S&M ?

Moral to the story is do not let sales people or Marketing and Publicity off the firmly held short leash of reality if you want happy and satisfied customers.

Amazon AWS Peril For All Associated CAD CAM Program Customers

Today I talk about a topic of growing interest as more and more software companies attempt to coerce customers into the online subscription model or online products like Fusion 360 which rely on web server farms to work. What started this was reading a most excellent article by Ralph Grabowski. http://www.upfrontezine.com/2016/02/byol-bring-your-own-license-frame.html is the link and you need to go there and read it before going further.

On 2/7/2016 10:02 PM, Ralph Grabowski wrote:
> As for being worried about the security of storing your firm’s proprietary IP [intellectual property] on remote servers that you do not control, well don’t, says Mr Brown. “Concerns about security and performance are starting to dissolve. Amazon AWS focuses on data center security, and has hundreds of people concerned about security. Contrast that to the efforts in most private data center, and the contrast is dramatic.”

I get so tired of the continual misrepresentation regarding this cloud security. https://aws.amazon.com/agreement/ will take you to the current legalese regarding how confident Amazon is regarding complete and total security for customers. Of particular interest.

Section 8.1 gives Amazon the right to turn your stuff over to any regulatory or governmental agency. It reads in part “We may disclose Your Content to provide the Service Offerings to you or any End Users or to comply with any request of a governmental or regulatory body (including subpoenas or court orders).” I assume it also means without subpoenas and court orders is how I read it since any does mean any. So the ChiComs want a look at your intellectual property they can have it. Or a corrupt individual from say the Obama Whitehouse or Justice Department or the Clinton Foundation.
As corrupt as this current version of the federal government is do you honestly think your hard work would never be for sale for a “campaign contribution”?

Section 10 Disclaimers is fun to. We are not responsible for anything of note or worth. You went here to bad so sad.

Section 11 Is exceptionally delicious. The evasion from any repercussions from use of their products and statement of their complete confidence in what they offer in this section is particularly heart warming.

I think Amazon is the largest online server entity of the three mentioned and without going to the other two I bet it is safe to say they do the same T&C thing as Amazon. I don’t know about any of you but section 8.1 is particularly troubling and means anything you have with Amazon can be had for the mere demand of a faceless and unaccountable to you bureaucrat who can then profit one way or another from your property. Do you see any other way to interpret the very words Amazon put there? It means to me any foreign government where Amazon can be legally bound by their edicts has to surrender upon demand your stuff.

It takes big brass balls to stand there and say how safe Amazon AWS is and then hope like crazy that no one reads the fine print. You go there you deserve what happens to you and I can’t think of a bigger wake up call than this cavalier treatment of customers by Amazon AWS T&C. Any CAD or CAM software that demands you use this paradigm to work with deserves to lose you as a customer. Their contempt for everything you have worked hard for except the money they demand from you is staggering.

Question for you Amazon guys. How many of the hundreds of people you have working on security are actually lawyers figuring out how to not make you liable for the ecosystem you have created?

The Autodesk Juggernaut Picking Up Speed

It was a couple of years ago when I gave up on Solid Edge ever getting the market share it deserved. One of the chief reasons was what I perceived to be a new ploy by Autodesk to assemble pieces of the complete manufacturing puzzle together to smother competition. This first really began with the acquisition of HSMWorks and continued with the purchase of Delcam lock stock and barrel. Today I was perusing the CNC Cookbook site and specifically this area. http://www.cnccookbook.com/CCCNCSurveys.html

Reading the CAD and CAM surveys was a bit of an eye opener. Now there is a section in here where they talk about how they generate the data used if you are interested. I was not as I figured with a couple of million visitors a year the surveys probably had a pretty good representation of what is reality in shops earning a living with software.

As a CAD side note here go through the years and see how poorly Solid Edge fares here. This has been my personal experience also for years as I have heard “you use Solid Edge? you are the first person I have met to do so” so many times it makes me ill. This is true by the way 60 some miles north of the SE headquarters in Huntsville. It fully explains why there are fewer than 500 users at the annual convention which ought to draw many more with its bargain rate pricing. The users just are not out there to begin with and CNC’s surveys are the first independent effort at generating market share data I have found that appears valid based on my own experience. It is what happens to a fine product whose future is determined by people who would just rather it went away.

Of even greater interest to me were the CAM surveys done here in 2010,2012,2014 and 2015. Go there and read in full these various years for CAD and CAM but in a nut shell here is what they had to say about CAM market share.

2010 2015
HSMWorks all Inventor and SW 1% 17%
Camworks I assume SW and SE 2% 5%
NX 6% 5%
Powermill 2% 5%
Featurecam 5% 3%
Mastercam 29% 27%

Basically Autodesk has gone from nothing to 25% of the higher end CAM per CNC Cookbook criteria.

In the “low-cost” category per CNC cookbook data we have Fusion 360 going from 0% in 2012 to 55% share in 2015.

I have been fascinated with the well planned multi-year conquest of Mid Range Manufacturing started by Carl Bass a few years ago and this survey was the first time I could see quantifiable results coming in. It does not look good for the competition. It is not my intent to hammer on the subscription thing here but with these stellar numbers I wonder why common sense has not overtaken the agenda at Autodesk. It is time to rethink this and stay with the seats and subs and let users choose. You guys are whipping the market as it is far better than I had imagined so don’t get greedy and keep winning customers just the way you have been by earning it with superior products and prices. Clearly it has been successful to date and market share is accelerating.

The other amazing thing here is the stark contrast to Dassault. SW has been famous for vaporware and grand visions from the bizarre mind of some French guy who could care less about reality. For years they have trotted out one cloud based thing after another just to watch them crash and burn. Autodesk on the other hand has Fusion 360 and the only thing that has crashed here is Dassault’s abortive plans to be first and foremost with the cloud for manufacturing.

I just sit here and think about SE as I write all this. Here longer than Inventor with 8% current market and here as long as SW with 22.7% bringing up the rear with 1%. It really makes a difference when the guy in charge has a plan. There was a brief period of hope under Newbury Cooper but they were run off for the cardinal sins of competency and caring about the future. Things not valued at Siemens who is struggling financially and can’t figure out why. SW’s share by the way has declined from 25% in 2013 and that is the result of mismanagement also. SW has had to work really hard to run off their long-suffering and amazingly loyal customers but they have begun succeeding.

Here is my vote for Autodesk to not change things as they were at the end of 2015 and continue on the way they were with a proven method for conquest.

Celebrate Solid Edge’s 2016 Fall Into Greater Obscurity

Well not really a cause for celebration as a user or as a community but certainly the Champaign corks must be popping in the UGS secret kill Solid Edge planning sessions. I was looking at Alexa page rank stats 1-1-16 just for the heck of it. So I type in Solidedging.wordpress.com and I get this.
solidedging.wordpress.com
Hmmm, curiosity stikes as I ponder how quickly SE faded into the woodwork again after the short lived social media attempts from SEU 2015 and the stellar performance of the VP Jim Miller in his once a year comments and appearance. Wonder what’s going on over there so I have a look.
Solidedge.com

Curiously enough there is contact info for this site and it is
solid edge contact info.

UGS again and am I surprised?

Solidworks
Solidworks.com
And Autodesk
autodesk.com

It looks like 2016 will be the worst year in a long time for Solid Edge regarding pursuit of market share and the goal of a vibrant user community. What Ralph Grabowski said in regards to the publicity and marketing claims for the purported but not verifiable size of the SE base to be 500,000+ attendance of 500 or so at SEU 2015 is pretty pitiful. Now I would further like to know just how many of these in attendance were paying customers and how many were Siemens employees or VAR types. 2014 was pretty sad and over 50% of the attendees were not paying customers. I sit here today and reflect on this as I consider how useful SE is to me and how many more users there should be for this remarkable program. I just don’t think it will ever be though and I ask you readers to think back, or better yet just search Google, for what all has been out there this past year.

Solid Edge besides the inherent capabilities does have one thing I really like and it may be their saving grace this year. With the advent of Autodesk’s upcoming subscription only model at the end of this month there may be new SE customers from this direction. SE as of yet does not force subscriptions and I hope they never do. CAD and CAM software is not like Adobe Photoshop and many buyers are NOT going to go with subs only. Look for just this single problem only subs will fail in many places. Namely the problem of what version does your company use and do you want to control updates. You would be amazed at how many companies write lots of programs and routines to go with their main CAD program and they only upgrade every few years as a result. I see their IT guys cringe as stupid comments about hassle free auto upgrades to the latest version froth forth from the insane minds of various corporate babble-speak guys who will try anything to make this pig look good.

Subscription only is the CPA driven wet dream of greedy corporate types who would like to see us as CAD cotton pickers toiling in their fields. They want pay up and shut up and not pay us because we earned it from you. The technical aspects of subs only is so onerous that while Autodesk does not talk about problems implementing this they surely have them. I can see many heated conversations between Autodesk and major customers who will force a two tier system over time. I think Autodesk will have to relent on this and allow seats and subs or lose too many sales from major accounts who will only work with seats. If they give major accounts the right to new seats where will they then draw the line on who qualifies? Autodesk is gambling I think that there will not be to much loss over this and that will inspire others to follow suit. If they all become subs plantation owners then we all will become chattel with the choice only of what plantation to toil at. Once again the metric of punishing legitimate users is trotted out in part by a desire to end piracy with the not insignificant benefit to the plantation owners of data hostage taking making you pay forever. Who owns your intellectual creations if you have to keep renting the ability to use it from a plantation owner anyway? Certainly not you.

So SE has this remarkable dumb thing by Autodesk given to them along with the continued atrophy of the desire of SW users to be a paying part of SW. SW remember was down last year and will be this year. Both Dassault and Autodesk try to give customers to SE but I figure SE has no intent to entice or pursue these pilgrims wandering around looking for a place that wants them the old fashioned way. Namely by earning their loyalty to begin with by what is there and in the future by continued improvements.

I find that stopping maintenance for SE has been painless and work will continue for years to come with ST8. Because SE sold me a permanent seat this can be done. This decision was based upon what is good for me with my money based on my judgement for value received. I most certainly recommend a seat of SE to those who do not have it for to you it will be new and powerful. You may elect to drop it later as I did but try it out.

Just don’t expect Siemens to manifest a desire to see market share growth for SE. Don’t expect to find users easily so SE will require you to absorb the cost of training nine times out of ten. I don’t like Mastercam or SW but as a business owner if I had to consider hiring a number of trained individuals I would be compelled to look at them. It did not have to be this way but it is and for a company like SE to have been around as long as SW and still be this small is a remarkable testament to the short sightedness of SE’s various overseers from the past and today. Get that one pack of lady fingers out and light them off and celebrate with UGS the grand vision of this year for SE being worse than last year.

Time Of Trouble For CAD CAM Customers Ahead

warning

WARNING WARNING DANGER CADCAM ROBINSON THAT DOES NOT COMPUTE!!!

As we head into the end of another year it turns out that this one is a bad one. My favorite CAD program which has been relegated to pretty serious anonymity again probably will stay there for good this time. The pace of improvements has slowed down and the capabilities of the shrinking programmer developer group have dwindled. The VP over SE has promised some things at the annual convention but did not lay out how this would take place nor any time frames. I conclude that this means there is nothing. Look, common sense would say that a structure and framework for further community and sales expansion would require planning and time already into this effort by convention time. So you see they would have been able to lay out exact details then. I choose to believe it is smoke and mirrors once again and just words to fill a space that requires them. Not a promise of future actions they are committed to.

This is a real shame as first Dassault tries to give SE customers for years and nothing. Now Autodesk is going full steam into this wretched subscription only model. SE as of this time does not YET say they will go subscription only. Make no mistake here I consider the availability of permanent seats to be the primary consideration of any software and second to this the capabilities of the software. You have to be able to control how your program works and be able to financially hold a club over the head of the program author to make them respond to your needs. No auto updates, no forced updates, no mandatory cloud, no server space you will end up paying $$$$ for because this is where they are heading, and no forced migrations to a new version of Windows or your CAD CAM program. When you go subscription only you are screwed for life.

Solid Edge is a perfect example. I have been a dues paying customer for seven years now until last August when I decided that there were not enough new improvements for me to continue paying. I would have renewed for $750.00 but not $1,500.00. I can still use SE ST8 for the next six or seven years and be quite productive. I can export to a cad neutral format and if the past is a prediction of the future old files can be brought forward with no problems and old ones opened with new the same. At least with as much data as I need anyway. These guys forget that value is a two-way street and when I no longer need support and new features the new features better be good. The VAR pissed and moaned about how this was not giving them any income and my thought was it is always about them and not the customer. How about my value received? So they stagnate and if you are not a customer still represent a great value for now. Jump on board for a year or two and then let them go and use your permanent seat like I will. Sad future for SE though. I like Ralph Grabowski’s observation from SEU2015. For a company that claims to have 500,000 users why is their attendance so small especially considering that it is one-third the price of SW and Autodesks annual conventions. I don’t believe for one second SE’s claims of market size and numbers.

https://forum.solidworks.com/thread/101000
How would you like to be a customer of Dassault’s SW? They have lost more than they get in new users and don’t seem to care. They limp along with buggy programs whose chief claim to market size appears to be that their customers have tons of legacy data and don’t want to move away. As Dassault does the Catia Lite migration over time they will move anyway and move to more expense, just as many if not more translation problems and as a bonus become data hostages as the new stuff will only work with a current subscription. As in monthly or yearly with no permanent seat you can fall back on when it is time to cut them loose.

PTC has just come out with subscription only. Just like listening to that idiot Obama they tell you how it is for your own good and will save you money and will give you great flexibility and freedoms to choose blah blah blah. And it will be just as beneficial in the long run as Obamacare. In the mean time you become chattel now and in the future.

Word of warning to anyone considering Autodesk. I think Inventor Pro HSM is the finest value bar none on the market right now for what you can do. CAD is clunky as all get out but I see the work being done there. HSM as I have stated has deficiencies in various areas but for me with simple turning and three axis mill parts is the finest CAM program out there. HSM Adaptive is better than Volumill which is touted as the industries best by many. Try Adaptive and you will change your mind. They are assembling a manufacturing ecosphere I approve of.
What they are also doing is something I find completely disgusting and that is by 1-30-16 you better have purchased a permanent seat or forget, possibly forever if this junk flies for Autodesk, personal autonomy and all that goes with it. You will no longer own your own data and will have to rent it back from Autodesk if you want to use it. I can see it now. You quit making a widget but have to pay for years just to be able to open the widget file because your customer expected support on the old part. With a permanent seat no additional cost but with subs you pay to play. Pay to play. Pay to play. Pay to play. Did you understand that? You pay to play. It appalls me how many CAD and CAM customers are oblivious to what is right around the corner from them.

Maybe all these companies are right. Maybe most customers don’t care what slop and egregious conditions are served up to them. It is hard for me to imagine that. I still talk to current Autodesk customers who ask me about this email they have recently received warning them about “stocking up” on permanent seats just to be safe. Another sales stratagem I find quite disgusting. In this case though the extortion via extra “stockup” seats just may be to the customer’s benefit. But why does Autodesk feel they have to go there anyway?

The answer is more appalling than you might think. They want to secure their financial future. Not yours by competitively supplying a superior product at a superior price as they are doing right now with Inventor Pro HSM. They want pay to play and you as chattel. I wonder if their analysts predictions of the future are so grim that they figure the only way they can survive and thrive is to reduce the cost of entry but make sure you can never leave.

So 2015 will be the year that goes down as the beginning of the end for benefits and control of destinies being equal between users and authors of software. It is my fervent hope that incomes drop precipitously for the pay to play guys and they will be forced into relenting back to the model of choosing what YOU the CUSTOMER want. I will be sending a check to Autodesk next week because I liked what I saw and it is a permanent seat. The day I can’t do that is the day I am gone.

Somehow I expect to see files from older versions of everything with growing regularity in the future as people step out of legal theft and wait for the next great thing to come along. After all I see around here shops working with CAD and CAM years old and doing fine. The only real exception to this is CAM if they do not have a current or recent good High Speed Machining program. I hope in the coming economic problems this pay to play junk comes back to roost on all these pay to play proponents.

CAD CAM Software Subscription Only, Unforeseen Complications for YOU

Recently I received an update to my HP printer. It ended up telling me that I could not run without buying more ink from HP. Now in the user manual it clearly states, that is the user manual and the conditions under which I purchased their printer to begin with, that I could run on black ink only. Furthermore there is a setting under printer properties that clearly states select grey scale to run in black ink only. So as a contract to me by virtue of the conditions I bought under and the properties which confirm the grey scale black ink only to run settings were intended I get this crap from HP. Extortion would be another way of stating this. The warning from HP I had from the printer after I installed much cheaper ink cartridges stated that any warranty would be voided by their use but did not prohibit their use. Legally I am sure they can’t since as a condition of buying this Officejet Pro 8600 I did not have to sign or commit to HP only ink.

ScreenHunter_139 Oct. 07 19.48

OK today I get this email from the ink cartridge people. HP sends you an innocent looking update which does not specify what is in there and does not allow you to select what parts of it you might want like Microsoft does. You get the whole chilona. Today I and every other HP 8600 printer buyer are being told we HAVE to do things we never signed up for and did not ask for. Arbitrarily and after the sale HP decides they want to make more money and make it in ways customers can’t run from. It is the capability to squeeze their customer base for more money that is just something no company seems to be able to resist over time no matter what the promises if they can do it. You see if you give people this kind of power over you it WILL be used sooner or later.

Is it to much of a stretch for you to see how this type of thing will come your way too if you cede the idea of permanent seats of software for rental? Where the conditions can and will change over time and there you are. Stuck with something that won’t work if you do not pay to play. All the power and might of legal hostage taking will be underlying your rental plans. When you have data created and locked under chattel securities and usable only with further payments that are subject to change with benefits to you subject to change why would you even go there? Here is one for you. You think data storage is free? You think there wont be a day where with cloud run software your stuff won’t be held to a cloud server and they wont charge you for the use of your data each month for the program and then the new server farm rental fees? Where they will force updates on you that will change the conditions to be different from when you signed up and you can blow it out your rear end if you don’t like it?

I want you to sit down and think about the ways you can come up with to screw customers over if you were in charge of a situation where where you could force pay to play. And change the rules to your benefit whenever. The company you signed up with today may well mean all the good things they say. Then like with Solid Edge the good guy leaves and utter junk takes their place. Or they get sued and now have to raise lots of cash. Or they get bought out (don’t think it can’t happen to whatever you currently use) and the new guys have saddled everything with more debt that has to be paid for. Just as soon as corporate leadership determines they need to change how they deal with you and in direct proportion to how much power you have given them over you, you are their hostage with no recourse. Except to leave entirely and if you have years of data locked up with these mercenary companies will you ever be able to?

Gee Dave it’s just printer ink don’t blow it all so far out of proportion. I mean after all no software company will EVER change the rules on you like HP did.

Isn’t it just peachy that software companies are doing this to secure their stable future? Without regard to your future or care for your expenses or profitability or your secure stable future? Where you better pay them before you pay your light bill or lose accumulated years of work and the ability to use that work? Am I wrong about this? Can you prove me wrong about this?

Inventor HSM Post Editing and Does Your CAM Vendor Care?

Today’s post could easily have been split into two topics. One on post editing how to links and the second on the regard your CAM author providers have for its users. The two are intertwined in this case and it all started with a post problem last Friday. I know it is a long one today but stick with it. There are some extremely useful post editing and creation links here. There are also comments regarding how one is treated by people who want your money and what they think they need to do to get it.

Inventor Pro HSM and Inventor HSM Haas Generic Turning .cps episode

Sometimes being an early adopter brings problems many won’t ever see. I ran across one of these this past weekend and it materialized in the form of a changed Haas generic Turning .cps post in the latest developmental build of Inventor Pro HSM. It always happens when you are in a hurry of course and the same day that I had Haas tech guys in to diagnose why my Y axis servo motor on my mill went out.

I learned a couple of things this weekend. One was the true value of a very active user community and the many dedicated users and Autodesk employees who populate this thing. I have always believed in community for a variety of reasons and I will shortly tell of the tale of the worrisome post.

The second thing was that I should not let past experience dictate the current response to an adverse situation. I came here from the world of CAMWorks for Solid Edge where hammering on known problems and being prepared for long hard fights to get anywhere was normal. Where you had to argue with Geometric about problems you could prove only to be dismissed because what you suffered from was labeled, I kid you not in many cases, as “intended behavior”. Where things took years to fix if at all. Where a company like Geometric would not respond to user problems and most certainly never darken the door of user forums to seek to solve user issues.

I had some parts to cut Friday and was trying to use the latest HSM developmental build and the Haas Generic Turning .cps does not work. So off I go to comment about the Haas lathe post in somewhat snarky terms. I ended up going back in there and changing the snarky bits out and have concluded I owe these Autodesk guys an apology. I went in there with a CW4SE user attitude because I had been well-trained to have one. What I have found were developers and super users and VAR employees who frequent these forums and who care about you being productive. What a change from Geometric where it has now been THIRTY weeks since the last CW4SE user post and over a YEAR since the last Geometric employee or VAR comment of any sort has happened on this forum. This vehicle that is supposed to aid users to be productive.

Well in Autodesks case I am here to say that there is a forum that works and a company that has employees that care. So on to the Haas Generic Turning .cps saga.

I am not a post guy. I have never learned to edit one nor create one and rely on the CAM software company to produce it. Just like the vast majority of users it is just another thing to have to learn for very infrequent use that I dodge if I can. My plate is already full and I don’t want to have to struggle with yet another thing to learn and then relearn again when I have to do something once in a great while.

First off here is the Autodesk CAM forum link. Go there and see. The door here is open unlike Geometric where they have a real reason to keep non users in the dark. If people only knew the reality of Geometric they would hardly ever buy the product.
https://camforum.autodesk.com/index.php

https://camforum.autodesk.com/index.php?topic=7593.0 will take you to a post started by me regarding this Haas post problem. Matt Nichols with Hagerman worked up a post for me that did exactly what was needed within a few hours of reporting the problems. It took as long as it did because I could not articulate why it failed. I had to go to the Haas user manual and work with it to get code that was for the Haas TL-2. Once I had a working example and could post good code and problem output code he had it fixed in a jiffy. The post was free and so was the help to make it right.

There was another aspect of this little journey that struck me. It was the resources available and people who wanted these tools to be in your hand. I looked a little closer at post creation and editing just for the heck of it and found the following.

First off was a new one from Laurens. Tip of the hat to you by the way. https://camforum.autodesk.com/index.php?topic=6138.0 will take you to some good advice on posts.

Of greater importance was the pair of posts by actual HSM Post Developers. From Andrew Ward we have a resource on how it all works. https://autodesk.box.com/s/3zk4u2tyr1v4oaphscog

From Achim another HSM Post Developer we have a tip on editing posts with Notepad ++. https://camforum.autodesk.com/index.php?topic=3202.0

By this point in time I was reconsidering my harsh initial comments of course and going back and changing them. I was also thinking maybe with a bit of tutoring this idea I had about post editing being arcane programmer geek stuff was not quite true and perhaps I will look into learning enough to get out of jams on my own.

The Importance of Who Has Your Back

I am continually struck by the difference I have experienced in all areas between Autodesk and CW4SE. Sadly this time it includes my soon to be past VAR Ally PLM. In many ways they have been exemplary but this fizzled away with the advent of CW4SE. The importance of posts can’t be overstated. If you can’t talk to your machinery and your VAR or CAM providers don’t care if you do there is big trouble on your horizon.

Getting posts for CW4SE is a headache. If you ever buy into this mess make sure you demand as a condition a verifiable working post before your money is plunked down and continued TIMELY support for this as a condition for you to buy. Make sure they can’t ignore you by saying they are working on it and six months later you still wait. They do not care. Get this in a contract and in written verifiable legalese so you have teeth to force Geometric to do what they won’t want to do. Your VAR will pass the buck to them so be forewarned. In my case with Geometric and Ally PLM I had problems because I did not do this. First off Geometric promised me verbally that when I got my lathe in the future I would be provided a post. They reneged on this promise to a guy that was materially responsible for them getting in the door with SE. Makes me wonder what their regard is for just plain old customers.

I now have loaded the 2015 ST8 version of CW4SE. I managed to slip in under the radar and since the cutoff date for ST8 CW4SE was 7-15-15 and my maintenance did not expire until 7-30-15 it worked. So what I am to say is as current as it gets. There are 18 .ctl posts and NONE of them are to be used for production per Geometric’s warnings. In HSM’s FREE working post library I count 96 today. 97 if I include the “Ault_Haas Turning_TL2.cps” which was provided to me quickly and without charge over the weekend to fix my woes.

I want you to consider something here and it is a window into the soul of these involved companies. I had considerable stature and standing in the SE ecosystem at the time this occurred and I was still treated this way. Eager to have me post good things but turn around and piss on me when I ask them to abide by their promise. And the VAR I had nothing but good things to say about until then kicked me in the teeth. Seems like CW4SE taints everything it touches. Yes I am a blogger but as far as I can tell anybody is treated by Autodesk CAM just like I was this past weekend. This common consideration of users was besides a CAM program that worked well and simply one of the key considerations I had when shopping for the CW4SE replacement

I had some really dreary conversations with Ally PLM about my promised lathe post. It started by me asking for the promised post only to be told they would check into it. I get an email back and they can provide one from Geometric for $500.00. (like Geometric does not have a cash cow Haas post done and on the shelf they have charged hundreds of times for I suppose.) So the conversations start and I mention the promise made to me. To bad so sad cough up the dough is the reply. I mention how many CAM programs have free posts and post support. Then they tell me that they have never heard of free posts and the resident CAM expert is supposed to be the source of this. I specifically show with screen captures the ZW3D and HSM post libraries available in the current two CAM programs I have access to besides CW4SE. Now I am sitting here and thinking to myself and getting angrier by the minute. After I have proven that I am correct and they are wrong they still had the unmitigated gall to say I did not know what I was talking about.

I finally told the support gal whom I had tremendous respect for until that moment that this conversation was permanently over. Out of respect for her and because I had always enjoyed dealing with her until then I was not going to continue this topic with her or Ally PLM. My promise to her and Ally PLM however was that I knew exactly how to handle this and this began a another series of sharply critical comments about Geometric and CW4SE. I hope today someone who is reading this and considering ALLY PLM and or Geometric’s CW4SE will think harder about who they deal with or what they buy into. Buy SE from ALLY perhaps but avoid CAM from them like the plague and if you go with CW4SE from anyone you deserve what you will get.

ALLY PLM keeps after me telling me that my SE maintenance is up the end of this month. My reply was that the $1,500.00 they want for CAD only for a year is the same as CAD and CAM everything from Autodesk. For 50% off I would renew. I still consider SE the better modeler but the pace of improvements has dropped off the radar and next year will be the same so why keep paying like they are doing something I am going to benefit from? I don’t expect they will take this offer so the company that had seven years of business from me will soon be history. Don’t let the door hit you on the way out.

Hey you Autodesk guys can you see why I was a bit testy initially regarding a post?

Value Is Where You Find It

Received my final renewal notice for Solid Edge yesterday. In June I had my last one for CAMWorks for Solid Edge. It is with some very fond memories and some really ugly ones that run through my mind as I ponder the idea of corporate intent and regard for customers. CW4SE of course never had a chance with me again after the debacle of software failure endured at this end from them. They have considerably improved their time frame for releases with ST8 being done a little over a month after release. Technically I could have expected a license for this since the cut off date was 6-15 and my license was good until 6-30 but why ask when I would not use it?

I had a little time under my belt with the ST7 SP1 CW4SE release which appeared to be as good as anything they had produced since the integration with SE. But I was struck at that time with just how cumbersome and time consuming CW4SE was compared to IP HSM and never cut another part with it again. Why take a chance on these guys again when their forums on the SW side are littered with long time problems, like the Tech Data Base which is fundamental to making CW4SE work like promised, that don’t seem to be well resolved since Geometric bought Pro CAM in 2008. When the time to complete a CAM plan took so much longer and was far more complicated than IP HSM.

Solid Edge is of course my favorite design program. Inventor is clunky to me and while part of it is being new to it part of it is inherent direct editing and importing deficiencies. I deal with a lot of imported parts and SE allows me to do what I want right away and quicker than the original authors could in the native program. The direct editing capabilities are far better at this time in SE and this is how I have worked for seven years now. The pace of improvements for SE has dropped off the chart though and the single biggest thing touted this year appears to be the ability to work with Surface Pro’s. Pure window dressing and the equivalent of SW offering two rendering programs at the same time a couple of years ago rather than digging in deep and providing meaningful new functions for CAD creation. It is what companies do when the desire to improve a product goes away for whatever reason and they want to leave it on autopilot because it does still represent income. Plus who could you sell it off to anyway?

The grand total of the maintenance for SE and CW4SE for one year would have been $4,000.00. For a combination of a design program that seems to have peaked and a CAM program that only masochistic people would inflict upon themselves while eagerly waiting for today’s problems to inflict pain on them.

http://descriptive.link/siemens-product-news-sans-solid-edge will take you to Siemens new products page. An industry news letter that talks about software they have. I see interesting things for the high dollar stuff but for SE there is just a silly rendering contest. Why nothing about what SE designs and the cool stuff made with it and case studies utilizing it? Because Siemens does not care to sell or promote SE. The corporate regard for SE shows in examples like this where Marketing and Publicity for Siemens chooses the topic. It could also just be laziness on the part of Siemens Marketing and Publicity where a whole group of people who must have had talent at some time are employed. But Siemens has a culture where if nothing is done and you can pass the buck for another day and not make a decision but show you had meetings you get this big fat paycheck so why work? Why be productive and make decisions that may come back and haunt you?

If I was a stock analyst and I knew how much time and potential was being wasted through this smothering bureacracy Siemens has allowed to develop I would dump my stock TODAY. It is no wonder their profits are down with the massive amount of unproductive overhead they have. I figure the Mr Big over Siemens bought UGS in an effort to make Siemens manufacturing more efficient. Sadly now the short term effects of buying efficiencies have been subsumed into the belly of the beast and the do nothing think nothing make no waves culture reigns supreme. Now put SE into these hands that not only can’t run what they have well but have genuine animosity as the UGS people do towards SE and tell me how bright the future is. Siemens admits they are not as productive as their main competitors and they are going to have to suffer real financial pain before changes are made. I have no idea how you would turn something like this around though when you have trained your workforce to be unproductve and have paid them handsomely to be so. They think it is what you want and the paychecks are proof of it.

I refuse to fund the people who have ruined SE’s future and have deliberately choked off funds to develop it with.

Here is the starkest contrast I can think of between Siemens SE and Autodesk’s Inventor. On one hand we have Mr Big Carl Bass who owns serious manufacturing equipment and has it in his personal shop. He writes CAM programs for parts his two hands and mind produces with this equipment. He is all the time making an effort to be in places that revolve around manufacturing and education for manufacturing. As far as I can tell not only is he in charge but he is committed to the idea that what he does is important not only to Autodesk’s future but Americas as a manufacturing giant. He is a maker of things with his own hands and he gets it.

Siemens has a guy over SE named John Miller that no one sees. No one hears from him and he has absolutely no desire to make chips or promote manufacturing or SE. Unlike Karsten Newbury who while he did not personally cut parts had a manufacturing degree and DID get the idea. Siemens ran him off and replaced him with a mindless drone place holder. This then is the measure of what these two companies believe and think of you the customer. Remember you make a living based upon the software you use and you better think hard about what regard the authoring company has for you. If I was an SE VAR I would be seriously concerned since it is clear Siemens does not worry about the future with anything SE.

So on one hand we have Inventor Pro HSM everything Autodesk has to offer for $10,000.00 and $1,500.00 per year. Over there we have SE + CW4SE at $20,000.00+ and at least $4,000.00 per year and this is far from everything there is to offer. You stick in 5 axis for CW4SE and you are probably up to nosebleed heigths. On one side we have a software company that believes in manufacturing and has spent money to buy the tools to make economical best in class manufacturing a reality if not now in the near future. They make their living off of software and it has to be right or they won’t thrive. On the other we have an ossified manufacturing concern where the software they purchased represents a tiny fraction of their gross and they quite frankly don’t care about you. They bought the software to improve their internal efficiencies. At one time I thought this was a good thing but now conclude for SE users it was not. A program on autopilot in a company that could care less about you is not good.

On one hand we have a company that offers free software to startups and free two axis machining to SW and Inventor users. They desire to be your partner. On the other hand we have, well we have Siemens SE. Run by what’s his face and stifled by UGS hatchet men in combination with Geometric who evidently only cares about your results when the heat is on. Oh, and two axis milling for SW and SE users is $4,500.00. People who like your money but don’t see things as a two way street where the benefits must accrue to both sides of the equation.

I have not made up my mind about SE in the title of this blog. I still really like the program and the Siemens UGS people can’t kill the productivity already there they can only limit it’s future development. I sit here with fond memories and a program that is still my principle modeler. It feels more and more though like Solid Edge belongs in the title of this blog as a memorial to what was and not what will be. Sure do miss you Karsten and what you represented that is no longer here.

Are Marketing and Publicity People really Aliens?

As an aside here. What is it with marketing people? Does their designer bottled water they must consume before any planning is done contain serious sedatives? I am seeing the same thing with Autodesk as I did with Siemens although not as bad. There are lots of things to talk about regarding events and activities already paid for or done. Human interest stories that revolve around software use or the educational field and you don’t see squat. I don’t know who is in charge of Autodesks marketing but the same disconnect as Siemens is there. Why is it so hard for these people to talk about what is here and present and relevant to existing and potential users?

I was told about a Walter cutting competition in Germany I believe it was. Where HSM did really well and the only negative thing was the endmills did not last quite as long time wise as they did in Volumill. Well the physics of cubic inch metal removal rates being what it is I imagine they did not. But when you are cutting parts in less time I know what I want and it is the most metal gone per minute and HSM won that. It would have been interesting to see the total cubic inches removed per tool to. So why has marketing not talked about this and why can’t I get this information to blog about? I have asked and nothing although admitedly I have not asked marketing people for this I have asked others within Autodesk.

Carl Bass was on sabbatical recently but he made time to go by an educators conference and talk about software I presume. He does not need a prompter or a script. He has a passion for this and I hear it was very well received. Is this not a relevant human interest story to CAD and CAM users? Somewhere buried in the files of things good to talk about and already paid for that Marketing and Publicity is so clueless about this too dwells. I would really like to be in the mind of a marketing dude for one day just to see how they figure out what is important and what to talk about. The public face that is the result of their efforts is so alien to me and so lacking for content readily available that I just can’t figure out what makes them tick.

But then I drink spring water and not “designer” water so perhaps I never will understand.

Is It Geometry Or Is It A CAM Bug?

Had a chance recently to look at a part where the problem for the user was that he could not cut into a corner pocket in Fusion 360. This reminded me of a similar situation I had with Inventor Pro HSM 2016. Namely how do you cut a .0625R corner with a .125 endmill? I had trouble on a part too and found that for some reason IP HSM would not allow me to do this and I had to change the radius or fib about tool size and suffer from those induced problems. In reality though what HSM was preventing me from doing was for my own good as there is never a good corner finish at any sort of speed when the radius of the mill and corner are the same.

Here is the problem section of the part.
Original cavity

It is pretty easy to make mistakes on your own or to have imported geometry you did not check well enough. Often during edits people make mistakes for a number of reasons and we all have done similar things. So what is the mistake here? It is not so readily evident to the eye and the .125 diameter endmill won’t cut into the .125 corner pockets. Why?

geometry problems

Look at the above screen capture. The yellow line is a diagonal between existing corners. We can draw a line and then create a circle off the center of the line and see just how far back from the true corners the holes really were. Look closely at the opening of the corner pockets and you can see the section where the opening width becomes .123 since we are past circle center point.

There are three answers here and it depends on the requirements of the part. If it had to be off center and this exact diameter and a drill point bottom is not an issue drill and ream. If the hole could be moved to the “line” center and it could grow to .126 diameter use the .125 end mill the user wanted to use to begin with. This will cut. Or if the hole center needed to stay where it was and could grow to .126 put some flats on the geometry like below. Now that the opening will be a true .126 width the end mill will do just fine. I suspect the intent here was to just get a “square” corner the only way you can get one by milling and the whole thing could have been accomplished better with a .126 diameter hole back just far enough to make the square.

amended cavity with flats

More CAM problems with geometry origins happen then designers who do not cut parts ever dream of and some of them are not apparent to those who do not make things. In truth all of us who actually make things have been in a hurry and distracted from concentrating on just one thing and have been subject to this kind of oversight as to what the problem really was. Or indeed have been the source of the problem when in a hurry and we don’t catch out own mistakes. OK tell me you have not done this exact thing in the past?

It can be easy to sit there in justifiable anger at the CAM program no matter which one we are using. If we had just backed off a bit and looked at why and included the geometry into the problem solving equation I bet there are times each of us could save ourselves some grief. It is the kind of stuff that happens when you get busy and distracted so next time give a moments thought to the idea that it could be the CAD and not the CAM.

Trouble In Paradise

I find myself in two worlds where CAD is concerned right now. I know Solid Edge well and for the work I have it is so powerful. I also have Inventor which I don’t know much at all and so suffer from the newbie problems that make things seem worse than they are. But I still cling to the idea of Synchronous Tech and the concept of direct editing as found in SE to be the best out there.

There were reasons though for my move to Inventor Pro HSM and this week gave me pause to think about one aspect in particular. On one side I see a growing commitment to people who make things for a living from design to build and on the other I see a rudderless ship adrift. Have you ever read seemingly unrelated news bits and come to conclude based upon the evidence that what is going on is not good? Companies do in spite of a desire not to talk about directions or problems telegraph this information anyway from things they can’t hide.

What started this today was the latest issue of UPFront Ezine. I noticed that the ad I was accustomed to seeing there for Solid Edge was absent this week and I had been used to seeing it in every issue. I got to thinking of other things related to this. Here is one.

” Solid Edge University
Early bird discount extended
$100 off through July 31st

Dear David,

Great news: the early bird deadline for Solid Edge University has been extended, so you can still save $100 if you register by July 31st.
Save even more, when you register two more of your colleagues from your company, because the third registration is FREE. The 3 for 2 conference pass allows 3 people from the same company to attend for the cost of 2. At early bird rates, that’s a significant savings.
Join us in Cincinnati, October 26–28th and network with Solid Edge developers and other Solid Edge users, and meet with our market leading application partners at this annual user conference. The agenda includes several hands-on workshops and multiple tracks for Solid Edge users of all levels, from beginners to advanced users, and the opportunity to get certified in Solid Edge free (a $99 value).
Register today!”

Market leading application partners? The plethora of them and among them jewels like Geometric? PR dudes are funny even when they are trying to be serious but I digress.

What do you do when you are not selling something and you have committed to it based upon projections? You offer a discount and I figure that the SE guys are finding out a few things. They have in John Miller a leader who has yet to make a policy statement or clarify direction. He has not communicated one time to users in almost a whole year now and what has been attributed to him on the BBS was not written by him mark my words and prove me wrong. So we have Solid Edge this wonderful thing being run by a guy so disconnected from the product he is over it is unreal. People remember Karsten and what was going on under him. They also have eyes and ears and see and hear nothing of value or excitement since Siemens ran him off and put a place holder in. I bet the numbers are frightening and panic is beginning to set in. The big annual yearly event self destructing right there in front of us.

Talking to the Autodesk guys to try and figure out why there is no direct import option for .par and .asm for Solid Edge. There is for all the other bigger CAD programs. It costs roughly $300,000.00 to create import capabilities for Inventor. SE of them all is not there. So I think of two reasons off hand for this. Autodesk fears how good SE is and does not want to make interaction between the two easy that could cost them users when they see how cool SE is. SE has such a small market share that it is not worth it for Autodesk to do it. Now in spite of SE trotting out some make believe numbers about their market share I have to conclude they lied and Autodesk does not have an importer because there are not enough SE users. NX is in there so we know Autodesk is willing to port to Siemens software.

It is a small world in some ways. People move from company to company but stay within their area of expertise. Talking to a manufacturing engineer employed by Autodesk in Nashville last week and as an ex UGS employee he was quite familiar with the idea that the UGS cabal hates and would like to dismember SE. He almost finished sentences for me. Some ideas have evidence to support them and this idea of corporate sabotage of SE keeps coming up where ever I go. Yet another example.

The public face of SE is in complete dis-function mode and the idiocy of a roll out for SE ST8 at PLM World announced just before the event took place is still hard to grasp. I bet not one SE user was at the SE Roll Out except for employees and they DO NOT COUNT.

They have been agonizing over this certified SE expert user thing and as far as I know after a couple of years this is still not complete.

I add all this up and I see at the least a division being seriously curtailed with bad results for users and what I really lean towards is this. Siemens wants to junk SE but like Dassault with SW can’t afford to do it right now. This year had the fewest major improvements for SE as far as I am concerned since I started with them in ST1. You take something you don’t like and choke it enough it becomes pretty debilitated and Siemens/UGS has a choke hold on these guys.

I hate to see all this but by the same token as the evidence continues to accumulate the wisdom of having fled to Autodesk where there is a future and Mr Big does care and there is a trained labor market and work available looks better with time. The very best value in integrated CADCAM is the sole possession of Autodesk in the form of Inventor Pro HSM and while I hate having to learn yet another CAD program it will be worth it just to feed that wonderful CAM program attached to it. Can you tell my days run like they are supposed to now?

By the way, if you are an SE user and can make it to SEU15 do so. It is the best price in the industry for this kind of event you will see and some very talented people from Huntsville who DO care about your success and needs will be there. My experience is that they pay far greater attention to attendee input than from any other source. I expect to be there and perhaps I will see you there. It may well be the last one before the tentacles of PLM World kill this off again and for this reason alone merits your consideration as under John Miller who could care less once it dies it will never happen again. I can assure you that once these clowns get ahold of it the cost to attend will triple and you will have to be resigned to being shoved off into the red headed bastard step child corner again if you do go.

Hard to imagine the fortunes of SE could turn so dire in such a short time.